Dakota Durango Forum banner
81 - 100 of 345 Posts
Will do but in the meantime can you do me a favor and measure the bottom side of your cab where the skirt will mount? I'll need to do this personally myself in due time but it would be nice to get a good idea on the length. I see you don't have flares also, are they even available for the Gen IVs. Thanks in advance.
I'm another that would probably be interested in a set for the QC if they ever came to be
 
Nice...Let me know that it went out and the amount so I can include it in the total deposited please.
not tryin to push anything but just wondering, how long do you think til u can get the first set out and shipped? my 00 cc dak is in the body shop at the moment and suppose to be done by the end of the month bein completely repainted
 
Discussion starter · #86 ·
not tryin to push anything but just wondering, how long do you think til u can get the first set out and shipped? my 00 cc dak is in the body shop at the moment and suppose to be done by the end of the month bein completely repainted
Feb 22nd is the anticipated first batch ship date. They'll be going out FedEx 2-3 day so all that have paid their balance in full prior to the 22nd should have them by the 26th.
 
Feb 22nd is the anticipated first batch ship date. They'll be going out FedEx 2-3 day so all that have paid their balance in full prior to the 22nd should have them by the 26th.
PMed!
 
Discussion starter · #89 ·
I sent a deposit, so when will you need the rest?
If all goes according to plan, I'll need the balance by next Saturday in order for me to ship out on the 22nd. Else, the set will be sent whenever the balance is paid after that. All orders after the 22nd will need to be paid in full at the time of order and should ship within 48 hours of ordering.
 
Discussion starter · #91 ·
how committed are you to doing the quad cab sets for the Gen IV's? If you're serious, I'll send my deposit this weekend.
Gonna head out this weekend and get some accurate measurements but yes...I am very committed to doing them for all the Dakota Generations and various models and do so by the end of March the latest. The only determining factor for being able to do them with this batch is that of the flexibility of the first mold that I need the deposits for. I have to make a mini mold for one of the smaller pieces first to test the flexibility and then I'll take it from there. But by then, the deposit period will be over. Sorry. I'll let all know what exactly is doable as soon as I know or NLT the 22nd.
 
I'm another that would probably be interested in a set for the QC if they ever came to be
That'd be pretty cool if you could get a batch for the QC guys, I wish i could look at how they look on a QC but, if it comes down to it, i'd be willing to put a deposit down
 
Discussion starter · #96 · (Edited)
Update

Currently 50% of the needed Deposits Goal has now been met to begin production the week of Feb 15th.

35.5 hours remaining for deposits and an opportunity for $30 off the BASE price.

If you Gen III QC guys wanna get in on this, go ahead and get your deposits in within this timeframe as well for I'm fairly certain now I can make the mold for them as well. If I have to, I'll work nonstop next weekend to get them all done by the 22nd as promised.
 
Update

Currently 50% of the needed Deposits Goal has now been met to begin production the week of Feb 15th.

35.5 hours remaining for deposits and an opportunity for $30 off the BASE price.

If you Gen III QC guys wanna get in on this, go ahead and get your deposits in within this timeframe as well for I'm fairly certain now I can make the mold for them as well. If I have to, I'll work nonstop next weekend to get them all done by the 22nd as promised.
:mullet:
 
81 - 100 of 345 Posts