Dakota Durango Forum banner
161 - 180 of 218 Posts
Discussion starter · #161 ·
It may but nobody knows as nobody has the info have been told valves open way before and after tdc
 
Discussion starter · #162 ·
And they already have a .520x
 
I know, I've been running 224 cams for a long time. And I have a few sets of other cams too. I was at one time working with Marty at KRC to get him the info he wanted about P/V clearance.
 
Discussion starter · #165 ·
Do you have it or can you get it?
 
I know, I've been running 224 cams for a long time. And I have a few sets of other cams too. I was at one time working with Marty at KRC to get him the info he wanted about P/V clearance.
Do you know what the P2V clearance is? If not what would be the most lift you would run?
 
I know, I've been running 224 cams for a long time. And I have a few sets of other cams too. I was at one time working with Marty at KRC to get him the info he wanted about P/V clearance.
Off topic but I see in your Sig a few mods I would love to do. I think a supercharger is out of the question for now but I would love to know more about your billet fuel rails, if you don't mind to share.....
 
Discussion starter · #168 ·
I'm sure I have the same ones they are Krc performance billet ones I payed $150 I think for mine then had a crossover made and some custom fittings made so factory fuel line clips right in
 
Discussion starter · #170 ·
No it is not
 
That sucks. Looking at these I wonder if they have holes tapped out for a "y" splitter? What does yours look like?
 
I have as set of Hi-Potek rails (anodized blue). Richard did a very nice job on them. They come with an -6 o-ring hole in each end of both rails. Your "Y" would be before going into rails at one end or the other at feed end and regulator end.
 
I have as set of Hi-Potek rails (anodized blue). Richard did a very nice job on them. They come with an -6 o-ring hole in each end of both rails. Your "Y" would be before going into rails at one end or the other at feed end and regulator end.
So what all is needed to make his billet rails plug and play? I emailed him and he said its going to be close to 400 if i want a crossover braided line and a fitting for the quick disconnect to the fuel feed line.
 
Either way works for me.
 
I'll have to check that out later. I do know that I need to do something different bc with the 08 intake manifold the fuel rail crossover is really tight against the front of the intake manifold and MAP sensor.
 
Are you planning to keep it returnless or convert it to a return system?
I believe that I'm going to keep it return less. If I buy his rails what else will I need? I'm curious if the fuel rails are already drilled and tapped for the crossover and main fuel line.
 
if you go billet fuel rails the crossover can be in the back instead of the front.

My rails were from KRC. I have a converted to a return system with a fuel cell and -6, -8, -10 and -12 fuel line.
 
161 - 180 of 218 Posts