Front end back together with new upper & lower ball joints, sway bar end links, hub bearings, cleaned up and coated frame, a-arms, and springs with KBS rust stop. Installed new hardware on the brakes and put in new piston seals.
10 ton :banana2:Not everyone has a 2 ton press at their disposal lol